Avalon Mechanical Consultants Ltd.

Resort and Recreation Projects

In addition to design on new facilities, estimates of savings and installation costs associated with a wide array of load reduction, systems upgrade, and new technology options have been provided for several projects. Arena air quality work has also been done.



Project Location Size
Energy Upgrade for the Tahsis Recreation Centre (resulted in our design of DDC controls, new boiler plant, heat recovery systems and architectural upgrades).  
Power Smart Study of Strathcona Gardens Recreation Centre, Campbell River (resulted in our design of plant controls, lighting upgrades, power factor, and a new boiler plant).  
Kerry Park Arena Boiler Plant Replacement, Mill Bay.  
Power Smart Study of The Kerry Park Arena (resulted in our design of desiccant dehumidifier, EMCS, lighting and equipment upgrades)  
Complete Conversion from Steam and Conventional Controls for CFB Esquimalt Naden Recreation Center 33,400 sq.ft
Saltspring Island Village ResortSaltspring Island31,500 sq.ft
Complete Conversion from Steam and Conventional Controls for Royal Roads Rec CenterColwood32,000 sq.ft
CFB Comox, Squash CourtsComox2,500 sq.ft
Multi-Centre Room at Gordon Head ComplexSaanich19,000 sq.ft
Energy Retrofit of the Crystal Pool (lighting and controls)Victoria 
Power Smart Study of The Comox Valley Recreation Centre  
Energy Study of the YW/YMCAVictoria 
Sidney ChurchSidney9240 sq.ft
Multipurpose Building for Baptist ChurchCampbell River6,000 sq.ft
Bradley BuildingMt. Washington15,200 sq.ft
East Indian Cultural CentreNanaimo12,200 sq.ft
TI to DOB City BingoPort Alberni13,200 sq.ft

 

© Avalon Mechanical Consultants Ltd. Updated March 23, 2007